Just lusting after pretty things as usual!
Yes bought the house, then found they put a retention on the mortgage, so jumped in with both feet and bought it anyway. Had to
Do asbestos survey (passed thankfully with only safe stuff here)
Get electrics certified (still to do)
Heating and plumbing certified (done, with a couple earths to install on gas/water pipes and vent to insall in room with boiler in it)
Repair/renew all external blown render (still to do!! struggling to get a plasterer believe it or not)
Replace/repair all external joinery (two large front bay windows to be replaced in four weeks, lots of windows to sand/paint)
Install adequate drainage (still to dig two new soakaways and run pipework)
Install a kitchen (bodged in a crap one just to pass for now)
Timber/damp report (got to reset all floors on ground level yet, and have whole house treated for woodworm)
and a bunch of other stuff, my last day is November 8th!! Busy busy, and have Z club AGM coming up so busy trying to pull my finger out for that, oh and fix my car and bike, no time to sleep!