Heres a couple more panels I've made zinc primed and ready to fit
this is where the above panel will go but on the inside of the a post plug welded in then seam weld all the edges the front edge will meet the fold on the new footwell panel and be welded to it as it should have been done will cut out 50mm hole for drain pipe later