8658kv
Club Member
Sean
The car didn't sell.
Thanks again for the exhausts.
Steve
Sean
The car didn't sell.
Thanks again for the exhausts.
Steve
I ain't got a camera and I'm not all that at loading stuff onto my iPad
Base is done had a night when it only went down to 0 degrees so wot with cement generating its own heat and was gonner be 5 degrees next day we had a bit of luck in getting the base down.Ingredients consist of 2 ton of hardcore, 42 bags of dust , 8 ton of ballast,Directions. lay hardcore evenly,go over with wacker,couple of bricks to raise the metal grids,mix dust and ballast and pour evenly until you get a nice even layer,smooth and level with 12 foot plank,leave to dry overnight.job done,there you have a base for a 12-20 ft timber garage,now the hard bit,wot Zed do I put in it