Thanks, Mine will have to be done in record time, will only have about two weeks to strp the front end, remove the engine and everything in the bay, take it to bare metal, seam weld it, spray it, fit my coilovers and build it all back up.Thanks Ian look forward to seeing your good luck for when you start
Its very quiet tonight isn't it. Only giving myself two weeks as I work away from home most of the year and I'll only have 4-5 weeks off when I do the work. I need to leave some time to drive the thing aswell as work on it and if I say two weeks to do everything then I might end up getting it done in less than 3.congratulations IAN i think your the only new post on forum tonight just noticed where you are gutted as i would have come and gave you a hand keep me posted ps why only two weeks take your time ,if a jobs worth doing its with doing right,you might regret it later put some pics up and thanks again
Yeah, I definitly want to drive it as much as possible.Ian, if you only have a short time for your 260Z be careful not to take it off the road and end up not driving it for a while. That car has spent long enough having a 'makeover' poor thing, she wants to party :unsure